Our projects |
MAJOR COMPLETED PROJECTS
Natural Gas Pipeline
190 km, 24 inch Underground Natura190 km, 24 inch Underground Natural Gas Pipeline
4 each Main Line Valve Stationl Gas Pipeline
4 each Main Line Valve Station
Natural Gas Pipeline
Pig Launching Station
Khormor Pig Launching Station
Chamchamal Intermediate Pig Station
Erbil Pig Receiving Station
Pig Launching Station
Khormor Pig Launching Station
Chamchamal Intermediate Pig Station
Erbil Pig Receiving Station
Zap River Crossing (135 m)
2 each Road Crossing (36 m)
17 each Road Crossing (24 m)
53 each Road Crossing (12 m)
Zap River Crossing (135 m)
2 each Road Crossing (36 m)
17 each Road Crossing (24 m)
53 each Road Crossing (12 m)
MAJOR ONGOING PROJECTS
In 2024 Hamreen Lake Oil Services LLC.
was successfully prequalified and awarded the BGC
Project “Domestic Gas Pipeline Construction to Duhok Power Plant”
Client: KAR GAS PIPELINE CO. LTD.
124.500mt. 36” Natural Gas Pipeline Mechanical Construction
🔧 Alignment & Pipe Bending
🧰 End Preparation, Line-Up and Automatic Welding Works
🔩 124.500 mt / approx. 10,500 welding joints🎨 Field Joint Coating
🛠 Approx. 10,500 welding joints⬇️ Lowering-In
🛤 Mechanical Works of Special Crossings
🔗 Tie-Ins
💧 Hydrostatic Testing, Caliper Pigging and Drying
🧴 Pipeline Preservation